Demo workspace
PatternOS/Demo/Lifecycle
Try with your brand
Product lifecycle · 14 stages Fictional sample

A garment lives across 14 accountable stages.

This is the live lifecycle of the Northline Relaxed Hoodie. Each stage carries status, readiness, blocker and the exact next action — no more spreadsheets to track who owns what.

What is this?
A structured 14-stage timeline that replaces fragmented spreadsheets, emails and slack threads.
Why it matters
Owners and production managers see at a glance where a garment is, what is blocking it, and what to do next.
Stages complete
4/14
In progress
7
Blocked
2
Avg. readiness
68%
Stage rail
01
Idea
100%
02
Design
100%
03
Pattern
95%
04
Material
70%
05
Grading
90%
06
Tech Pack
80%
07
Sample
70%
08
Costing
65%
09
Supplier
75%
10
Production
64%
11
Inventory
15%
12
Launch
58%
13
Feedback
40%
14
Improve
30%
Stage detail
  1. 01Idea
    complete
    100%
    Next:
  2. 02Design
    complete
    100%
    Next:
  3. 03Pattern
    complete
    95%
    Next: Validate after sample corrections
  4. 04Material
    in progress
    70%
    Blocker: Pilling test missing
    Next: Schedule pilling test before bulk
  5. 05Grading
    complete
    90%
    Next: Re-grade after body length correction
  6. 06Tech Pack
    in progress
    80%
    Blocker: Awaiting v1.3 after corrections
    Next: Approve Tech Pack v1.3 once issued
  7. 07Sample
    in progress
    70%
    Blocker: Body length and hem rib outside tolerance
    Next: Issue corrected sample round 2
  8. 08Costing
    in progress
    65%
    Next: Confirm with final supplier quote
  9. 09Supplier
    in progress
    75%
    Blocker: Certificate expires in 21 days
    Next: Request updated certificate
  10. 10Production
    blocked
    64%
    Blocker: Sample not approved for bulk
    Next: Approve sample round 2
  11. 11Inventory
    not started
    15%
    Next: Plan goods receipt after PO approval
  12. 12Launch
    blocked
    58%
    Blocker: Unsupported recycled packaging claim
    Next: Remove claim or upload evidence
  13. 13Feedback
    in progress
    40%
    Next: Capture sample reviewer notes
  14. 14Improve
    in progress
    30%
    Next: Plan production-2 corrections